Once upon a time, an asset management company in charge of a third of the UK’s rolling stock entered York’s National Railway Museum, identified ten air conditioning vents in the driver cabins of its exhibits, and took off with them to install on trains currently in service.
.
It was a desperate measure, made after an automotive company gave a minimum order size of 10,000 to manufacture replacements. Angel Trains is faced with a predicament like this all too often. The trains they lease are in operation, on average, for 20 years, with some having lasted half a century before being put into retirement.
.
And while, that’s the goal for a company that generates profit by maintaining rail vehicles through regular refurbishment, those trains are also often fitted with parts that are obsolete, originally supplied by companies no longer in business, with design drawings nowhere to […]
Case Study: How PepsiCo achieved 96% cost savings on tooling with 3D Printing Technology
Above: PepsiCo food, snack, and beverage product line-up/Source: PepsiCo PepsiCo turned to tooling with 3D printing...
0 Comments